Water Technology has been involved in the development of Wyndham Harbour since the early conceptual planning stages in 2003. The Harbour has evolved from the initial conceptual design through to final design and construction with the help of the Water Technology coastal and environment team. The key work items over the life of the project have included:
The work at Wyndham Harbour, combined with similar harbour and marine development projects at Martha Cove, Mornington Safe Harbour and Portarlington have provided Water Technology unparalleled experience and knowledge of the environment and coastal and oceanographic processes within Port Phillip Bay along with the procedure required to take a concept design to built product.
Long-term harbour development project from concept design, coastal process studies and impact assessments