This study was prepared for the East Gippsland CMA in June 2011 and involved a detailed hydraulic assessment of the impacts of the Snowy River Rehabilitation Project on the river and floodplain. The study incorporated an iterative hydraulic and geomorphic approach to assessing the implications of the river rehabilitation and also to assess risks associated with potential avulsion sites. A two-dimensional hydraulic model was developed to spatially resolve the effects of changes in vegetation communities along the floodplain and riparian zones on flood levels across the study area. The assessment also considered the effect of in-channel bars under a range of flow conditions, with the results indicating a high level of correlation between increased flood level and channel bar formation. Sensitivity testing of the hydraulic model also revealed that the inclusion of bed scour in the model is a critical assumption, as if the bed does not scour through the system during flood events, water levels and overbank flows are expected to be dramatically raised in a number of reaches, with follow-on effects downstream.

Scope:

Location:

SNOWY RIVER, NSW ,

Client:

EAST GIPPSLAND CMA

Similar Projects

Koala Habitat Mapping

Review of existing data and undertaking field surveys to identify areas of known core and potential koala habitats to enable conservation efforts...

View Project

Supporting the Restoration of Barmah Forest Wetlands

Extensive and ongoing field studies to map the distribution and cover of threatened wetland-dependent species and trial of propagation methods...

View Project

River Rehabilitation and Recreation Management Plans for Hills Reserve and Savages Crossing

The water quality of the Brisbane River can be improved through management of popular recreation sites along the River...

View Project

At work across Australia

With offices throughout the country, our team brings a
national perspective to local challenges.

Talk to an expert