The former Rum Jungle mine site is located 105km by road south of Darwin, near Bachelor in the Northern Territory. Uranium, copper, nickel and lead were mined and processed at various times between 1934 and 1971. The mining operations led to significant environmental impact within and downstream of the site, primarily from the long-term generation of acid and metalliferous drainage (AMD).

Scope:

Location:

RUM JUNGLE, NT

Client:

NT DEPARTMENT OF MINES AND ENERGY

In 1982, an $18.6 million financial assistance agreement was established between the Commonwealth and Northern Territory Governments for the Territory to rehabilitate the site. Rehabilitation was followed by environmental monitoring programs, which spanned 12 years. At the time, the Rehabilitation Project’s objectives were considered to have been achieved. However, recent studies have documented the gradual deterioration of those original works.

In 2003, the former Department of Infrastructure, Planning and Environment and the former Department of Industry, Tourism and Resources entered into a Memorandum of Understanding to better define the current state of the environment at the site. On 7 October 2009, the Northern Territory and Commonwealth Governments entered into a National Partnership Agreement (NPA) on the management of the former Rum Jungle mine site. The Department of Mines and Energy (DME) is responsible for the overall management and coordination of projects to achieve the objectives and outcomes of the NPA which include site maintenance activities, environmental monitoring programs and investigative studies to develop an updated site management and rehabilitation strategy for the site by mid-2013.

The DME commissioned Water Technology Pty Ltd to assist with surface water investigations for the Rum Jungle mine site rehabilitation project. In particular, this included:

  • Development of a rainfall-runoff model of the East Finniss River catchment to assist with calculation of pollutant loads and dilution rates for pollutants leaving the site and entering the river.
  • Delineation of mine site surface water catchments.
  • Estimation of rainfall infiltration rates into the waste rock dumps and Dyson’s Backfilled Open Cut.
  • Flood study to assist the rehabilitation program.
  • Geomorphic stability assessment.

Similar Projects

Coastal Adaptation Investigation

Assessment of potential coastal adaptation options for two towns...

View Project

Assessment of Boat Ramp Upgrades

Investigation and assessment of design improvements to boating facilities...

View Project

Koala Habitat Mapping

Review of existing data and undertaking field surveys to identify areas of known core and potential koala habitats to enable conservation efforts...

View Project

At work across Australia

With offices throughout the country, our team brings a
national perspective to local challenges.

Talk to an expert